Semi-dry Screed is an alternative to wet and dry screed. Sand and Cement make an ideal screed system which is suitable to receive almost any type of floor covering. It is a semi-dry system which makes it the best choice for floors that are required to be laid to falls.
At Green Hands Flooring Systems we install sand/cement screed floor to a high standard using quality materials and highly skilled staff.
Dry-pressed screed withstands the weight of a person after 12 hours. Laying the finish floor covering is made after 8 days from the date of execution of semi-dry screed. Prepared foundation is ready for laying any finish covering (tile, carpet, parquet flooring, laminate flooring).
Comparison of floor screeding technologies |
||
Criteria |
Dry-pressed floor screed |
Regular floor screed (wet) |
Laying a day for 1 team | up to 400 sq.m | up to 50 sq.m |
The finish grinding, leveling, self-leveling floor | don’t need | need |
Possibility to walk on the screed | after 12 hours | after 72 hours |
Laying the finishing cover (tiles, parquet, linoleum) | after 8 days | after 28 days |
Durability on technical characteristics | high | high |
Possible fluctuations for 2 meters | 3 mm | 10 mm |
Need to lift materials to the height (multi-storey objects) | no | yes |
Water consumption | min | max |
Possibility of water leakage during installation | no | yes |
Saved expenses of tile adhesive | yes | no |
Reinforcement | fiber | mesh |
Need for equipment | yes | no |